PROJECTS
VILHELMINA SHALE-HOSTED URANIUM PROJECT
PROVEN URANIUM RESOURCE, LOW CAPITAL AND OPERATING COST
The Vilhelmina Project is a flagship exploration initiative that focuses on extracting uranium, phosphate, and rare earth elements (REEs) from the alum shale.
This project benefits from historical exploration work, including 176 drill holes totalling approximately 7,000 metres, which confirmed significant uranium anomalies.
SCALABLE PRODUCTION & LONG LIFE OF MINE
Location
Norråker, Sweden
Resource Estimate
~200Mt grading at ~200ppm U, 0.15% REE, and 1.3% P
Permit Applications
Covering more than 32,700 hectares
RAVENBERGET SHEAR-HOSTED URANIUM PROJECT
Located within a major NNE-trending deformation zone, the Ravenberget Project has historical outcropping uranium mineralisation with grades up to 1.88% U. Additionally, there are multiple unresolved SE-trending uranium boulder trains with grades over 0.1% U.
Project geology indicates significant potential for shear-hosted uranium deposits.
STRONG EXPLORATION POTENTIAL
Historical Mineralisation
Up to 1.88% U in outcrop
Boulder Trains
Grades over 0.1% U
GILLBERGET SHEAR-HOSTED URANIUM PROJECT
The Gillberget Project is situated within a major NNW-trending deformation zone, featuring historical uranium mineralisation and multiple unresolved S to SE-trending uranium boulder trains.
The project’s geological settings suggest the presence of valuable shear-hosted uranium deposits.
STRATEGIC GEOLOCATION POSITIONING & STRONG UNRESOLVED BOLDER TRAINS
Historical Mineralisation
Significant historical outcropping uranium
Boulder Trains
S to SE-trending unresolved uranium boulder trains